<legend id="39z8y"></legend>
    1. <sub id="39z8y"></sub>

      <legend id="39z8y"><track id="39z8y"></track></legend>
    2. <style id="39z8y"></style>

    3. <wbr id="39z8y"></wbr>
      婷婷伊人綜合中文字幕小说,亚洲人人爱,成人影片在线观看18,亚洲国产成人精品无色码,亚洲人成色无码yyyy,人人妻人人躁人人DVD,欧洲综合色,欧美精品自拍
      Hotline:400-880-1556

      English




      Regulatory information ▕ The FCC of the United States issued the first edition of KDB 364244 D01 standard

      Author:中認(rèn)聯(lián)科 time:2024-05-16 Ctr:1530

      On April 16th, 2024, American FCC issued the first edition of KDB 364244 D01 standard, and the new KDB364244D01mmeas 15.255 RADARS V01 is a guiding procedure for the revised 15.255 radar equipment certification.

      The main contents of KDB 364244 D01 standard are as follows:

      1, 15.255 radar equipment is divided into the following categories:

      640.png

      2. 15.255 Radar equipment certification needs to pass PAG review.

      The applicant should provide the contents according to the requirements of Appendix B (9 items in total), and it needs to be explained and proved to meet the requirements in order to speed up the PAG application.

      3. Matters needing attention in testing:

      A. The test configuration confirms that the test distance of radiation test (the distance between the transmitting antenna and the test antenna) should be greater than or equal to the far-field distance;

      B. The test instrument confirms that in order to improve the dynamic range of the test, a low noise floor amplifier is needed; Pay attention to the image frequency when using mixer; To measure the peak power of pulse radar with spectrometer, it is necessary to correct the measurement results with pulse desensitization coefficient. To measure the peak power of FMCW radar with spectrometer, FMCW correction factor is needed to correct the measurement results.

      C. EUT confirmed that the FMCW radar scanning mode does not need to meet the requirements of FCC part 15.31(c).

      4, test project requirements and methods:

      A. Bandwidth measurement: pulse radar measures 10dB bandwidth, and ANSI C63.10-2020 chapters 9.3 and 9.4 provide testing procedures for 10dB bandwidth and 99% bandwidth;

      B. Power measurement. In 15.255, the peak EIRP is mostly required to be measured. The peak EIRP can be measured directly, or the average EIRP can be measured and the peak EIRP can be calculated considering the duty ratio. Testing power no longer requires the forced use of RF detectors;

      C. Stray measurement, according to ANSI C63.10-2020, sections 9.10 and 9.11;

      D frequency stability, which should be measured at the highest and lowest operating frequencies and in the modulation mode that can produce the widest emission bandwidth. According to ANSI C63.10-2020, section 9.5.

      Warm tips

      ZRLK has been focusing on the testing and certification of consumer electronic and electrical products for 20 years, always paying attention to the changes of laws and regulations in various countries, and providing customers with one-stop testing and certification services to ensure that your products enter the target market quickly. If you want to know more about the requirements of FCC certification in the United States or have products that need FCC certification in the United States, please feel free to contact us, and our engineers will serve you as soon as possible!

      Related Articles
      • Practical Tips | Guide to Completing FCC ID Certification for Car Camera Export to the United States

      • Car dashcam leaves Thailand | NBTC Certification Practical Guide, ensuring compliance and avoiding risks when entering the market

      • Network camera exports to Brazil | ANATEL certification practical operation guide, avoiding pitfalls and smoothly passing customs inspection

      • Battery pack exports from Japan | PSE certifies compliance guidelines, ensuring smooth customs clearance without any issues

      Follow Us